Flood Embankment Bank
Enterprise one-stop service.
- Place of Origin:Jiangsu, China
- Payment Term:T/T, L/C, D/P
- Delivery Time:Within 10 days
- Packaging:Standard export packing
- Min Order: 1
- Stock: Yes
Flood control embankment is a temporary small embankment that is repaired at the top of the adjacent water surface to prevent flood from overflowing the top of the embankment. It is a kind of on-site assembly type embankment. It is usually used as a national, watershed or provincial and municipal fixed-point warehouse emergency equipment reserve, and is also directly equipped in the mobile emergency teams of provinces and cities.
Main feature
(1) Innovative process: the prefabricated plate dam flood control subdyke breaks through the traditional thinking mode, abandonstraditional dyke materials and processes, and is a new, fast, cheap and environmentally friendly disaster prevention and mitigation equipment.
(2) Simple and efficient: with water control, efficient and fast;
(3) Simple assembly: the dam group is flexible and adaptable; Easy to store and transport, low cost.
(4) Easy to recycle: can be recycled and reused, green environmental protection.
Sub-embankment Size | 1.3 m * 10 m |
---|---|
Designed River Width/Wave Height | 4 km/0.3 m |
Gross Weight of the Product | 298 KG |
Safety Factor | 2.0 – 3.35 k |
Height of the Sub-embankment | 1.30/1.35 m |
Construction Speed | 60 minutes for 100 people/km |
Width of the Sub-embankment Unit | 1.0 m |
Water Blocking Height | 1.0 m |
Design Wind Speed | 6.0 m/s |
Net Weight of the Product | 255 kg |
Applicable Embankment Quality | Sandy loam, loam, clay, concrete, asphalt |
Original Embankment Top Width | More than 4.0 m |
Structural composition | It is mainly composed of corner frame, beam, fender, rubber elastomer and positioning fixed pile |
Materials and technology | The prefabricated slab dam breaks through the traditional thinking mode and abandons the traditional construction materials and techniques. It is a new, fast, cheap and environmentally friendly disaster prevention and mitigation equipment |
Practical application | Mainly used for sandy loam, loam, clay and concrete and other soft and hard levees for emergency flood prevention and rescue |
Characteristic | The prefabricated slab dam has the advantages of controlling water according to water, high efficiency and fast speed. DAMS are flexible and adaptable; Easy to store and transport, low cost; Recycling, green environmental protection and other features |
Structural principle
Structure composition and function Prefabricated plate dam flood control sublevee mainly consists of six parts:
(1) Corner frame: axial connection of aluminum alloy profiles, as the support frame of the dam body. (2) Beam: made of aluminum alloy square material and special joint connection, as the dam body connection support rod.
(3) Fender: The corrugated glass steel material is connected with the beam through a special fixed device. Its functions are as follows: first, as a connecting piece, the adjacent Angle frame is connected to form the bearing carrier of the dam body; The second is as a rigid connection plate.
(4) Rubber elastomer: made of high-quality rubber with elastic function, used for sealing water between adjacent support plates.
(5) Positioning fixed pile:It is made of round steel.
Emergency organization and implementation
On-site rescue work of prefabricated slab dam flood control sublevee. With the characteristics of tight time, bad environment, strong technology and high safety, its organization and implementation must emphasize unified organization, unified plan, unified command and unified implementation; We must adhere to the pre-plan, scientific decision-making, full preparation, strong guarantee; It is necessary to ensure that the construction is carried out according to the technological process, the inspection is carried out according to the technical requirements, the acceptance is carried out according to the safety standards, and the maintenance work after the construction is continued.
Apply
It is mainly used for sandy loam, loam, clay, concrete, asphalt and other soft levees for emergency flood prevention. On the one hand, it can prevent the flood of embankments and DAMS caused by low flood control standards or excessive flood, and the river water level surges and exceeds the top of the embankments. On the other hand, it can prevent the high water level in the flood season, due to the strong wind and big waves, the river overflows the top of the dike and causes local wave danger. At present, the flood control embankment is made of unit coaming panels to achieve the purpose of multi-purpose.